Equipment List Specification
The equipment list is based on the requirements collected for the lighting system in the load schedule. This is a
sequential step-by-step process. The information gathered in previous steps is required to complete following
steps. Once all the steps are completed, a complete Bill of Materials (BOM) for the system is created:
Module selection is based on the number and type of loads.
Automation Enclosure selection is based on the number of modules and the available space in the
enclosure.
User interface selection is based on the user control requirements.
Wiring plan is based on the previous steps and the layout of the environment.
Control processor is based on the size of the system (large systems should have a dedicated processor).
Network block selection is based on the layout and distribution of the loads and user interfaces.
Accessories selection is based on the required accessories (telephone and alarm systems, HVAC control,
intercom systems, occupancy sensors, etc.).
NOTE: Crestron D3 Pro software is the ideal tool for specifying an equipment list. A fully documented help file
supports the easy-to-use screens and views. It offers the designer a starting place for determining modules and
enclosures. The Crestron D3 Pro software can also generate a load schedule report. Refer to the Crestron website
for detailed information about D3 Pro.