Crestron C2N-SDC-DC Shade & Drape DC Motor Controller
The required wire gauge should be chosen such that the resistance value
is less than the value calculated in the resistance equation. Refer to the
following table.
Wire Gauge Values
RESISTANCE
(R or Ohms)
WIRE GAUGE
(AWG) (MM
2
)
4 16 1.50
6 18 0.75
10 20 0.50
15 22 0.34
13 Doubled CAT5
8.7 Tripled CAT5
NOTE: All Cresnet wiring must consist of two twisted pairs. One
twisted pair is the +24V conductor and the GND conductor, and the other
twisted pair is the Y conductor and the Z conductor.
NOTE: When daisy-chaining Cresnet units, strip the ends of the wires
carefully to avoid nicking the conductors. Twist together the ends of the
wires that share a pin on the network connector, and tin the twisted
connection. Apply solder only to the ends of the twisted wires. Avoid
tinning too far up the wires or the end becomes brittle. Insert the tinned
connection into the Cresnet connector and tighten the retaining screw.
Repeat the procedure for the other three conductors.
NOTE: For larger networks (i.e., greater than 28 network devices), it
may become necessary to add a Cresnet Hub/Repeater (CNXHUB) to
maintain signal quality throughout the network. Also, for networks with
lengthy cable runs, it may be necessary to add a Hub/Repeater after only
20 devices.
Operations & Installation Guide - DOC. 6373 Shade & Drape DC Motor Controller: C2N-SDC-DC y
7